Cargando…

The CERN site in full construction period

The nearly finished building towards the left houses the 600 MeV Synchro-Cyclotron (SC). Towards the right, one sees the circular structure of the 26 GeV Proton-Synchrotron (PS). 4 months after this picture was taken, the SC began operation, on 1 August 1957. The PS accelerated protons to 24 GeV on...

Descripción completa

Detalles Bibliográficos
Autor principal: Photographic Service
Lenguaje:ENG
Publicado: 1957
Materias:
Acceso en línea:http://cds.cern.ch/record/615846