Cargando…
The CERN site in full construction period
The nearly finished building towards the left houses the 600 MeV Synchro-Cyclotron (SC). Towards the right, one sees the circular structure of the 26 GeV Proton-Synchrotron (PS). 4 months after this picture was taken, the SC began operation, on 1 August 1957. The PS accelerated protons to 24 GeV on...
Autor principal: | Photographic Service |
---|---|
Lenguaje: | ENG |
Publicado: |
1957
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/615846 |
Ejemplares similares
-
CERN site 1965
por: CERN PhotoLab
Publicado: (1965) -
Aerial view of the CERN site
por: CERN PhotoLab
Publicado: (1962) -
View of CERN site taken from the Main Building
Publicado: (1958) -
CERN site : aerial view looking North-West
por: CERN PhotoLab
Publicado: (1963) -
Workshops of the MF group in Building 100 at CERN
por: Laurent Guiraud
Publicado: (2000)