Cargando…

The LHC Proton Beam in the CERN SPS: an Update

During the 2001 run the beam-induced electron-cloud, generating dramatic vacuum pressure increases and fast transverse instabilities, was the main limitation in the achievement of the nominal LHC beam intensity in the SPS. Nominal longitudinal and transverse parameters at the extraction energy (450...

Descripción completa

Detalles Bibliográficos
Autores principales: Arduini, Gianluigi, Baudrenghien, P, Bohl, T, Collier, Paul, Cornelis, K, Höfle, Wolfgang, Linnecar, Trevor Paul R, Shaposhnikova, Elena, Tückmantel, Joachim, Wenninger, J
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/619366
_version_ 1780900344425873408
author Arduini, Gianluigi
Baudrenghien, P
Bohl, T
Collier, Paul
Cornelis, K
Höfle, Wolfgang
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
Wenninger, J
author_facet Arduini, Gianluigi
Baudrenghien, P
Bohl, T
Collier, Paul
Cornelis, K
Höfle, Wolfgang
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
Wenninger, J
author_sort Arduini, Gianluigi
collection CERN
description During the 2001 run the beam-induced electron-cloud, generating dramatic vacuum pressure increases and fast transverse instabilities, was the main limitation in the achievement of the nominal LHC beam intensity in the SPS. Nominal longitudinal and transverse parameters at the extraction energy (450 GeV) could be achieved only with a single batch and with a maximum bunch population of 0.5×10^11 p. In 2002 the threshold for the onset of the electron cloud in the arcs could be increased from 0.4×10^11 p/bunch to 0.9×10^11 p/bunch by means of a dedicated 10-day 'scrubbing' run with the LHC beam. At the end of this period four LHC batches with design bunch population (1.1×10^11 p) could be injected for each SPS cycle, as foreseen for the nominal filling scenario, without provoking vacuum interlocks. After a series of machine development sessions the LHC beam with nominal intensity could be accelerated to 450 GeV with nominal longitudinal emittance and with transverse emittances close to the design values for the first three batches. The problems encountered with this high brilliance beam and the solutions developed are presented.
id cern-619366
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-6193662023-05-31T13:22:20Zhttp://cds.cern.ch/record/619366engArduini, GianluigiBaudrenghien, PBohl, TCollier, PaulCornelis, KHöfle, WolfgangLinnecar, Trevor Paul RShaposhnikova, ElenaTückmantel, JoachimWenninger, JThe LHC Proton Beam in the CERN SPS: an UpdateAccelerators and Storage RingsDuring the 2001 run the beam-induced electron-cloud, generating dramatic vacuum pressure increases and fast transverse instabilities, was the main limitation in the achievement of the nominal LHC beam intensity in the SPS. Nominal longitudinal and transverse parameters at the extraction energy (450 GeV) could be achieved only with a single batch and with a maximum bunch population of 0.5×10^11 p. In 2002 the threshold for the onset of the electron cloud in the arcs could be increased from 0.4×10^11 p/bunch to 0.9×10^11 p/bunch by means of a dedicated 10-day 'scrubbing' run with the LHC beam. At the end of this period four LHC batches with design bunch population (1.1×10^11 p) could be injected for each SPS cycle, as foreseen for the nominal filling scenario, without provoking vacuum interlocks. After a series of machine development sessions the LHC beam with nominal intensity could be accelerated to 450 GeV with nominal longitudinal emittance and with transverse emittances close to the design values for the first three batches. The problems encountered with this high brilliance beam and the solutions developed are presented.LHC-Project-Report-638CERN-LHC-Project-Report-638oai:cds.cern.ch:6193662003-06-05
spellingShingle Accelerators and Storage Rings
Arduini, Gianluigi
Baudrenghien, P
Bohl, T
Collier, Paul
Cornelis, K
Höfle, Wolfgang
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
Wenninger, J
The LHC Proton Beam in the CERN SPS: an Update
title The LHC Proton Beam in the CERN SPS: an Update
title_full The LHC Proton Beam in the CERN SPS: an Update
title_fullStr The LHC Proton Beam in the CERN SPS: an Update
title_full_unstemmed The LHC Proton Beam in the CERN SPS: an Update
title_short The LHC Proton Beam in the CERN SPS: an Update
title_sort lhc proton beam in the cern sps: an update
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/619366
work_keys_str_mv AT arduinigianluigi thelhcprotonbeaminthecernspsanupdate
AT baudrenghienp thelhcprotonbeaminthecernspsanupdate
AT bohlt thelhcprotonbeaminthecernspsanupdate
AT collierpaul thelhcprotonbeaminthecernspsanupdate
AT cornelisk thelhcprotonbeaminthecernspsanupdate
AT hoflewolfgang thelhcprotonbeaminthecernspsanupdate
AT linnecartrevorpaulr thelhcprotonbeaminthecernspsanupdate
AT shaposhnikovaelena thelhcprotonbeaminthecernspsanupdate
AT tuckmanteljoachim thelhcprotonbeaminthecernspsanupdate
AT wenningerj thelhcprotonbeaminthecernspsanupdate
AT arduinigianluigi lhcprotonbeaminthecernspsanupdate
AT baudrenghienp lhcprotonbeaminthecernspsanupdate
AT bohlt lhcprotonbeaminthecernspsanupdate
AT collierpaul lhcprotonbeaminthecernspsanupdate
AT cornelisk lhcprotonbeaminthecernspsanupdate
AT hoflewolfgang lhcprotonbeaminthecernspsanupdate
AT linnecartrevorpaulr lhcprotonbeaminthecernspsanupdate
AT shaposhnikovaelena lhcprotonbeaminthecernspsanupdate
AT tuckmanteljoachim lhcprotonbeaminthecernspsanupdate
AT wenningerj lhcprotonbeaminthecernspsanupdate