Status of the LHC Main Dipole Pre-Series Production
The procurement of a pre-series of 90 main dipoles was decided as the first step towards the series production of 1232 arc main dipoles within the LHC magnet program. The pre-series production is already completed at one contractor's site and is approaching the completion at the other two compa...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/630339 |
Sumario: | The procurement of a pre-series of 90 main dipoles was decided as the first step towards the series production of 1232 arc main dipoles within the LHC magnet program. The pre-series production is already completed at one contractor's site and is approaching the completion at the other two companies. Technical aspects: manufacturing tolerances, manufacturing difficulties, first evaluation on non-conformities appearing during production and a short overview of magnet performance are presented. |
---|