Cargando…

Wheels lining up for ATLAS

On 30 October, the mechanics test assembly of the central barrel of the ATLAS tile hadronic calorimeter was completed in building 185. It is the second wheel for the Tilecal completely assembled this year.

Detalles Bibliográficos
Lenguaje:eng
fre
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/680962
Descripción
Sumario:On 30 October, the mechanics test assembly of the central barrel of the ATLAS tile hadronic calorimeter was completed in building 185. It is the second wheel for the Tilecal completely assembled this year.