Cargando…
Muon Walls Setup in the Tilecal Module 0 Beam Test (August - September 1996)
Autores principales: | Bromberg,C, Davidek,T, Gallas,E, Huston, J, Leitner, R, Lokajicek,M, Miller,R, Némécek, S, Palacky, J, Richards,R, Schooltz, D, Soustruznik, K, Suk,M, Tas, P, Weichert,J |
---|---|
Lenguaje: | eng |
Publicado: |
1996
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/683566 |
Ejemplares similares
-
Muon Walls Performance in 1998 and 1999 Tilecal Beam Tests
por: Bromberg, C, et al.
Publicado: (1999) -
New Geometry of Muon Walls in October 1997 Tilecal Beam Test
por: Bromberg,C, et al.
Publicado: (1998) -
Remote Control of Muon Walls in the Extended Barrel Module 0 Tilecal Beam Test
por: Bromberg,C, et al.
Publicado: (1998) -
Proposal for the Tilecal submodule surface protection with DISKOR V2076-7
por: Valkár, S, et al.
Publicado: (1998) -
The First Three TILECAL Submodule Assembly in Prague
por: Davidek, T, et al.
Publicado: (1996)