Cargando…

Muon Walls Performance in 1998 and 1999 Tilecal Beam Tests

Muon walls setup for beam test of the TILECAL barrel module~0 in June-July 1998 and July 1999 is described. The walls are remotely operated and their setting for hadronic shower leakage detection is described. The low energy tail suppression for events without leakage is illustrated.

Detalles Bibliográficos
Autores principales: Bromberg, C, Huston, J, Miller, R, Richards, R, Schooltz, D, Gallas, E, Hruska, I, Lokajícek, M, Némécek, S, Slavik, J, Weichert, J, Davidek, T, Krivkova, P, Leitner, R, Palacky, J, Soustruznik, K, Suk, M
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/683965
Descripción
Sumario:Muon walls setup for beam test of the TILECAL barrel module~0 in June-July 1998 and July 1999 is described. The walls are remotely operated and their setting for hadronic shower leakage detection is described. The low energy tail suppression for events without leakage is illustrated.