Cargando…
Muon Walls Performance in 1998 and 1999 Tilecal Beam Tests
Muon walls setup for beam test of the TILECAL barrel module~0 in June-July 1998 and July 1999 is described. The walls are remotely operated and their setting for hadronic shower leakage detection is described. The low energy tail suppression for events without leakage is illustrated.
Autores principales: | Bromberg, C, Huston, J, Miller, R, Richards, R, Schooltz, D, Gallas, E, Hruska, I, Lokajícek, M, Némécek, S, Slavik, J, Weichert, J, Davidek, T, Krivkova, P, Leitner, R, Palacky, J, Soustruznik, K, Suk, M |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/683965 |
Ejemplares similares
-
New Geometry of Muon Walls in October 1997 Tilecal Beam Test
por: Bromberg,C, et al.
Publicado: (1998) -
Remote Control of Muon Walls in the Extended Barrel Module 0 Tilecal Beam Test
por: Bromberg,C, et al.
Publicado: (1998) -
Muon Walls Setup in the Tilecal Module 0 Beam Test (August - September 1996)
por: Bromberg,C, et al.
Publicado: (1996) -
Proposal for the Tilecal submodule surface protection with DISKOR V2076-7
por: Valkár, S, et al.
Publicado: (1998) -
The First Three TILECAL Submodule Assembly in Prague
por: Davidek, T, et al.
Publicado: (1996)