Cargando…
Results from the Level-2 Pilot Project Testbeds
The ATLAS level-2 trigger has to offer an event rate reduction of approximately 1 in 100, from an input rate of up to 100~kHz. An RoI guided scheme and a sequential selection strategyreduces the resources required. Testbeds of up to 48 nodes havebeen constructed using different networking technologi...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/684050 |