ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels

This paper describes the ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels. The cooling and ventilation part describes the requirements for design and installation of more than 10 km of pipeline that is going to be laid down in the tunnels. Main operating parameters as well as manufac...

Descripción completa

Detalles Bibliográficos
Autores principales: Akhtar, S, Kühnl-Kinel, J
Lenguaje:eng
Publicado: 2002
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/687590
_version_ 1780901782760718336
author Akhtar, S
Kühnl-Kinel, J
author_facet Akhtar, S
Kühnl-Kinel, J
author_sort Akhtar, S
collection CERN
description This paper describes the ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels. The cooling and ventilation part describes the requirements for design and installation of more than 10 km of pipeline that is going to be laid down in the tunnels. Main operating parameters as well as manufacture procedures are explained. Preliminary work schedule with the cost estimate is also presented. Electrical power will be distributed from the LHC side and the SPS side for the machine and the general services. All power converters will be installed on surface buildings. The link between the main bend converters and the main bend magnets will be realised with water-cooled cables. Rest of the magnets will be cabled by using conventional copper and aluminium cables. Due to long lengths of the injection tunnels a dry 18kV transformer will be installed in TJ8 to serve the general services for TI8. The same will apply to TI2 by installing a transformer at the bottom of the PMI2 shaft.
id cern-687590
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-6875902019-09-30T06:29:59Zhttp://cds.cern.ch/record/687590engAkhtar, SKühnl-Kinel, JST/EL and ST/CV services for TI2 & TI8 LHC injection tunnelsXXThis paper describes the ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels. The cooling and ventilation part describes the requirements for design and installation of more than 10 km of pipeline that is going to be laid down in the tunnels. Main operating parameters as well as manufacture procedures are explained. Preliminary work schedule with the cost estimate is also presented. Electrical power will be distributed from the LHC side and the SPS side for the machine and the general services. All power converters will be installed on surface buildings. The link between the main bend converters and the main bend magnets will be realised with water-cooled cables. Rest of the magnets will be cabled by using conventional copper and aluminium cables. Due to long lengths of the injection tunnels a dry 18kV transformer will be installed in TJ8 to serve the general services for TI8. The same will apply to TI2 by installing a transformer at the bottom of the PMI2 shaft.ST-Note-2002-019-CVoai:cds.cern.ch:6875902002-11-13
spellingShingle XX
Akhtar, S
Kühnl-Kinel, J
ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title_full ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title_fullStr ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title_full_unstemmed ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title_short ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
title_sort st/el and st/cv services for ti2 & ti8 lhc injection tunnels
topic XX
url http://cds.cern.ch/record/687590
work_keys_str_mv AT akhtars stelandstcvservicesforti2ti8lhcinjectiontunnels
AT kuhnlkinelj stelandstcvservicesforti2ti8lhcinjectiontunnels