ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels
This paper describes the ST/EL and ST/CV services for TI2 & TI8 LHC injection tunnels. The cooling and ventilation part describes the requirements for design and installation of more than 10 km of pipeline that is going to be laid down in the tunnels. Main operating parameters as well as manufac...