ST-HM: not only cranes

This period of LEP dismantling and LHC installation is a real challenge for the ST-HM group. The group is now following several projects to cope with the diversity of requests. Although crane design and procurement still constitutes the majority of the workload, more and more of our time is nowadays...

Descripción completa

Detalles Bibliográficos
Autor principal: Bertone, C
Lenguaje:eng
Publicado: 2002
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/687591
_version_ 1780901782969384960
author Bertone, C
author_facet Bertone, C
author_sort Bertone, C
collection CERN
description This period of LEP dismantling and LHC installation is a real challenge for the ST-HM group. The group is now following several projects to cope with the diversity of requests. Although crane design and procurement still constitutes the majority of the workload, more and more of our time is nowadays dedicated to providing alternative handling solutions. In 2001/2002, our main studies concern cranes for LHC, industrial and shielded motorised doors, the upgrade/replacement of 32 lifts and mobile cranes. The years 2002/2003 will concern mainly the study of LHC handling systems such as trailers and heavy-duty tractors, specifically tailored containers and tools. In parallel, the monorail will be extended in the injection tunnel and CNGS tunnels and a new monorail system for TOF will be installed. Since the tunnel monorail infrastructure will be used for power feed and guidance purposes only, this requires that other transport systems be studied, such as forklift trucks, industrial and telescopic hoists.
id cern-687591
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-6875912019-09-30T06:29:59Zhttp://cds.cern.ch/record/687591engBertone, CST-HM: not only cranesXXThis period of LEP dismantling and LHC installation is a real challenge for the ST-HM group. The group is now following several projects to cope with the diversity of requests. Although crane design and procurement still constitutes the majority of the workload, more and more of our time is nowadays dedicated to providing alternative handling solutions. In 2001/2002, our main studies concern cranes for LHC, industrial and shielded motorised doors, the upgrade/replacement of 32 lifts and mobile cranes. The years 2002/2003 will concern mainly the study of LHC handling systems such as trailers and heavy-duty tractors, specifically tailored containers and tools. In parallel, the monorail will be extended in the injection tunnel and CNGS tunnels and a new monorail system for TOF will be installed. Since the tunnel monorail infrastructure will be used for power feed and guidance purposes only, this requires that other transport systems be studied, such as forklift trucks, industrial and telescopic hoists.ST-Note-2002-021-HMoai:cds.cern.ch:6875912002-11-13
spellingShingle XX
Bertone, C
ST-HM: not only cranes
title ST-HM: not only cranes
title_full ST-HM: not only cranes
title_fullStr ST-HM: not only cranes
title_full_unstemmed ST-HM: not only cranes
title_short ST-HM: not only cranes
title_sort st-hm: not only cranes
topic XX
url http://cds.cern.ch/record/687591
work_keys_str_mv AT bertonec sthmnotonlycranes