Cargando…
ST-HM: not only cranes
This period of LEP dismantling and LHC installation is a real challenge for the ST-HM group. The group is now following several projects to cope with the diversity of requests. Although crane design and procurement still constitutes the majority of the workload, more and more of our time is nowadays...
Autor principal: | Bertone, C |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/687591 |
Ejemplares similares
-
ST-HM design section: Strategy and working methods
por: Bertone, C
Publicado: (2003) -
ST-HM equipment consolidation
por: Rühl, I, et al.
Publicado: (2003) -
Logistique ST-HM pour le projet LHC
por: Prodon, S
Publicado: (2002) -
La section Opération au sein du groupe ST/HM
por: Masson, A, et al.
Publicado: (2002) -
E072/ST-HM - A dynamic maintenance strategie to meet the requirements of the LHC installation
por: Böttcher, O
Publicado: (2003)