Cargando…

New SPS cooling system: "The day after"

During the shutdown from November 2000 until May 2001, major modifications of the cooling system of SPS have been carried out in the frame of the refurbishment and restructuring of the water network on CERN sites (Water Project). Since the new configuration is based on a closed circuit loop, the mos...

Descripción completa

Detalles Bibliográficos
Autores principales: Arduini, Gianluigi, Nonis, M
Lenguaje:eng
Publicado: 2002
Materias:
XX
Acceso en línea:http://cds.cern.ch/record/687613