Cargando…

Timing and fast control

Abstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, s...

Descripción completa

Detalles Bibliográficos
Autor principal: Jost, B
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/691696
_version_ 1780902043484946432
author Jost, B
author_facet Jost, B
author_sort Jost, B
collection CERN
description Abstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, subject to the special LHCb requirements imposed by the LHCb two-level trigger architecture. We conclude that the RD-12 system can be used for our application, but that we have to build a few modules to support our high Level-0 accept rate (Readout Supervisor) and to support the requirement of partitioning (Switch). We expect no major problems in implementing both modules.
id cern-691696
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-6916962019-09-30T06:29:59Zhttp://cds.cern.ch/record/691696engJost, BTiming and fast controlDetectors and Experimental TechniquesAbstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, subject to the special LHCb requirements imposed by the LHCb two-level trigger architecture. We conclude that the RD-12 system can be used for our application, but that we have to build a few modules to support our high Level-0 accept rate (Readout Supervisor) and to support the requirement of partitioning (Switch). We expect no major problems in implementing both modules.LHCb-99-001oai:cds.cern.ch:6916961999-01-01
spellingShingle Detectors and Experimental Techniques
Jost, B
Timing and fast control
title Timing and fast control
title_full Timing and fast control
title_fullStr Timing and fast control
title_full_unstemmed Timing and fast control
title_short Timing and fast control
title_sort timing and fast control
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/691696
work_keys_str_mv AT jostb timingandfastcontrol