Cargando…
Timing and fast control
Abstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, s...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691696 |
_version_ | 1780902043484946432 |
---|---|
author | Jost, B |
author_facet | Jost, B |
author_sort | Jost, B |
collection | CERN |
description | Abstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, subject to the special LHCb requirements imposed by the LHCb two-level trigger architecture. We conclude that the RD-12 system can be used for our application, but that we have to build a few modules to support our high Level-0 accept rate (Readout Supervisor) and to support the requirement of partitioning (Switch). We expect no major problems in implementing both modules. |
id | cern-691696 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-6916962019-09-30T06:29:59Zhttp://cds.cern.ch/record/691696engJost, BTiming and fast controlDetectors and Experimental TechniquesAbstract -------- In this paper we discuss the current understanding of the design of the LHCb Timing and Fast Control (TFC) system. In view of the fact that there exists some infrastructure for a TFC in the form of the RD-12 TTC system we focus on the applicability of this system to the LHCb TFC, subject to the special LHCb requirements imposed by the LHCb two-level trigger architecture. We conclude that the RD-12 system can be used for our application, but that we have to build a few modules to support our high Level-0 accept rate (Readout Supervisor) and to support the requirement of partitioning (Switch). We expect no major problems in implementing both modules.LHCb-99-001oai:cds.cern.ch:6916961999-01-01 |
spellingShingle | Detectors and Experimental Techniques Jost, B Timing and fast control |
title | Timing and fast control |
title_full | Timing and fast control |
title_fullStr | Timing and fast control |
title_full_unstemmed | Timing and fast control |
title_short | Timing and fast control |
title_sort | timing and fast control |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/691696 |
work_keys_str_mv | AT jostb timingandfastcontrol |