Cargando…
The consequences of abnormal beam dump actions on the LHC collimation system
The consequences of abnormal LHC beam dump actions on the collimation system are evaluated. We consider both an asynchronous beam dump, where all 15 kicker modules fire together, and the pre-firing of one kicker module, followed by the firing of the remainder. The frequency of such failures is diffi...
Autores principales: | Assmann, R W, Goddard, B, Vossenberg, Eugène B, Weisse, E |
---|---|
Lenguaje: | eng |
Publicado: |
2002
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691845 |
Ejemplares similares
-
LHC beam dump system: Consequences of abnormal operation
por: Kramer, T, et al.
Publicado: (2009) -
Modular solid-state switch for the SPS and LHC beam dump systems
por: Vossenberg, Eugène B
Publicado: (2001) -
Calibration Measurements of the LHC Beam Dumping System Extraction Kicker Magnets
por: Uythoven, J, et al.
Publicado: (2007) -
Requirements for the LHC collimation system
por: Assmann, R W, et al.
Publicado: (2002) -
The LEP beam dumping system
por: Carlier, E, et al.
Publicado: (1994)