Cargando…
Preliminary risk analysis of the LHC cryogenic system
The objective of the study is to identify all risks to personnel, equipment or environment resulting from cryogenic failures that may accidentally occur within the cryogenic system of Large Hadron Collider in any phase of the machine operation, and that could not be eliminated by design. We then for...
Autores principales: | Chorowski, M, Lebrun, P, Riddone, G |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691872 |
Ejemplares similares
-
Preliminary Risk Analysis of the LHC Cryogenic System (CERN-LHC-Project-Report-324)
por: Chorowski, M, et al.
Publicado: (1999) -
The update of the Preliminary Risk Analysis of the LHC Cryogenic System
por: Chorowski, M, et al.
Publicado: (2013) -
Helium Discharge and Dispersion In the LHC Accelerator Tunnel in Case of Cryogenic Failure
por: Chorowski, M, et al.
Publicado: (2000) -
Updated Risk Analysis of the LHC Cryogenic and Helium Distribution System
por: Chorowski, M, et al.
Publicado: (2013) -
Preliminary cost estimate of LHC magnet and cryogenics system
por: Lebrun, P
Publicado: (1987)