Cargando…

Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor

In LHC it will be important to measure in a non destructive way and with good precision the proton beam profile from 450 GeV to 7 TeV. This can be achieved by using the synchrotron radiation emitted by the combination of the D3 bending magnet installed in the Interaction Region 4 (IR4) of the LHC an...

Descripción completa

Detalles Bibliográficos
Autor principal: Tommasini, D
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/691892
_version_ 1780902084716003328
author Tommasini, D
author_facet Tommasini, D
author_sort Tommasini, D
collection CERN
description In LHC it will be important to measure in a non destructive way and with good precision the proton beam profile from 450 GeV to 7 TeV. This can be achieved by using the synchrotron radiation emitted by the combination of the D3 bending magnet installed in the Interaction Region 4 (IR4) of the LHC and a 5 T undulator placed in proximity of D3. In total two of such combinations, one per beam, are needed. The D3 magnets are already designed and are being built by BNL. This preliminary design report introduces the undulator in this scheme. The general layout, the functional requirements as well as ressources and schedule are addressed.
id cern-691892
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-6918922023-05-31T13:25:10Zhttp://cds.cern.ch/record/691892engTommasini, DPreliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile MonitorAccelerators and Storage RingsIn LHC it will be important to measure in a non destructive way and with good precision the proton beam profile from 450 GeV to 7 TeV. This can be achieved by using the synchrotron radiation emitted by the combination of the D3 bending magnet installed in the Interaction Region 4 (IR4) of the LHC and a 5 T undulator placed in proximity of D3. In total two of such combinations, one per beam, are needed. The D3 magnets are already designed and are being built by BNL. This preliminary design report introduces the undulator in this scheme. The general layout, the functional requirements as well as ressources and schedule are addressed.LHC-PROJECT-NOTE-299oai:cds.cern.ch:6918922002-06-10
spellingShingle Accelerators and Storage Rings
Tommasini, D
Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title_full Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title_fullStr Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title_full_unstemmed Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title_short Preliminary Conceptual Design of the 5 T Superconducting Undulators for the LHC 450 GeV to 7 TeV Synchrotron Radiation Profile Monitor
title_sort preliminary conceptual design of the 5 t superconducting undulators for the lhc 450 gev to 7 tev synchrotron radiation profile monitor
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/691892
work_keys_str_mv AT tommasinid preliminaryconceptualdesignofthe5tsuperconductingundulatorsforthelhc450gevto7tevsynchrotronradiationprofilemonitor