Cargando…

A proposal for the time resolution of the Arc Beam Loss Monitors (BLMA)

We determine the time resolution needed for Beam Loss Monitors in the arcs of LHC. We consider the expectable density of beam halo and the uncontrolled growth of a closed beam orbit bump together with the transient quench limits.

Detalles Bibliográficos
Autor principal: Jeanneret, J B
Lenguaje:eng
Publicado: 2001
Materias:
Acceso en línea:http://cds.cern.ch/record/691949
Descripción
Sumario:We determine the time resolution needed for Beam Loss Monitors in the arcs of LHC. We consider the expectable density of beam halo and the uncontrolled growth of a closed beam orbit bump together with the transient quench limits.