Cargando…
The Control System for LHC TI2 & TI8 Converters
The power converter sytem for the transfer lines TI2 and TI8, with its 194 supplies powering magnets of 5.6 km total length between SPS and LHC, approaches the size of an accelerator. The control system for these supplies has a specification very near to that of the SPS due to the cycled current wav...
Autor principal: | Hundzinger, D |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691964 |
Ejemplares similares
-
The Magnet System of the LHC Injection Transfer Lines TI 2 and TI 8
por: Hilaire, A, et al.
Publicado: (1998) -
LHC TI2/TI8 TL Stability Check RUN II
por: Barbera Ramos, Moises
Publicado: (2019) -
Trajectory Correction of the LHC Injection Transfer Lines TI 2 and TI 8
por: Hilaire, A, et al.
Publicado: (1997) -
Beam and Controls Requirements for TI2 and TI8
por: Mertens, V
Publicado: (1999) -
Status and Plans for the SPS to LHC Beam Transfer Lines TI 2 and TI 8
por: Goddard, B, et al.
Publicado: (2004)