Cargando…
A Compelling Reason For Installing 46 H & V Beam Position Monitors in Each Arc of LHC V4.2
Autor principal: | Miles, J |
---|---|
Lenguaje: | eng |
Publicado: |
1996
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/691989 |
Ejemplares similares
-
Installation of beam screens in LHC arc cryomagnets
por: Cruikshank, P, et al.
Publicado: (1999) -
Concerning the Strength of Closed Orbit Correction Dipoles in the Arcs of LHC V4.2
por: Miles, J F
Publicado: (1996) -
Impedance of the LHC Arc Beam position Monitors
por: Brandt, D, et al.
Publicado: (2002) -
Configuration of the Beam Loss Monitors for the LHC arcs
por: Arauzo-Garcia, A, et al.
Publicado: (2000) -
Beam-Induced Surface Modification of the LHC Beam Screens: The Reason for the High Heat Load in Some LHC Arcs?
por: Petit, Valentine, et al.
Publicado: (2021)