Cargando…

Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis

During the installation phase of the LHC, a beam test of a complete LHC arc may be performed in the year 2006. One of the motivations for such a test is the experimental determination of the field errors of the main dipole magnets directly with beam. The possibility of obtaining useful information o...

Descripción completa

Detalles Bibliográficos
Autor principal: Wenninger, J
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/692050
_version_ 1780902118260998144
author Wenninger, J
author_facet Wenninger, J
author_sort Wenninger, J
collection CERN
description During the installation phase of the LHC, a beam test of a complete LHC arc may be performed in the year 2006. One of the motivations for such a test is the experimental determination of the field errors of the main dipole magnets directly with beam. The possibility of obtaining useful information on certain field errors from an analysis of the trajectory response to orbit corrector kicks has been evaluated. The influence of monitor noise and calibration errors has been tested. This first study indicates that under the conditions that have been evaluated, it is possible to determine the average a2, b2 and b3 field errors of the main dipoles and the average b2 field error of the main quadrupoles and perform a check of the test bench measurements of the magnets during the sector test.
id cern-692050
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-6920502023-05-31T13:25:27Zhttp://cds.cern.ch/record/692050engWenninger, JDetermination of LHC Main Dipole Field Errors during a Sector Test using Trajectory AnalysisAccelerators and Storage RingsDuring the installation phase of the LHC, a beam test of a complete LHC arc may be performed in the year 2006. One of the motivations for such a test is the experimental determination of the field errors of the main dipole magnets directly with beam. The possibility of obtaining useful information on certain field errors from an analysis of the trajectory response to orbit corrector kicks has been evaluated. The influence of monitor noise and calibration errors has been tested. This first study indicates that under the conditions that have been evaluated, it is possible to determine the average a2, b2 and b3 field errors of the main dipoles and the average b2 field error of the main quadrupoles and perform a check of the test bench measurements of the magnets during the sector test.LHC-PROJECT-NOTE-314oai:cds.cern.ch:6920502003-02-25
spellingShingle Accelerators and Storage Rings
Wenninger, J
Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title_full Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title_fullStr Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title_full_unstemmed Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title_short Determination of LHC Main Dipole Field Errors during a Sector Test using Trajectory Analysis
title_sort determination of lhc main dipole field errors during a sector test using trajectory analysis
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/692050
work_keys_str_mv AT wenningerj determinationoflhcmaindipolefielderrorsduringasectortestusingtrajectoryanalysis