Cargando…
Preliminary Study: Powering the Transfer Lines from SPS to LHC
After the decision to realise the transfer lines between SPS and LHC with room temperature magnets, a preliminary study of the powering scheme for these facilities has been performed. The purpose of t his note is to present the method used for this preliminary study and the results obtained. This st...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/692083 |
_version_ | 1780902125415432192 |
---|---|
author | Burla, P Pedersen, J |
author_facet | Burla, P Pedersen, J |
author_sort | Burla, P |
collection | CERN |
description | After the decision to realise the transfer lines between SPS and LHC with room temperature magnets, a preliminary study of the powering scheme for these facilities has been performed. The purpose of t his note is to present the method used for this preliminary study and the results obtained. This study proved the feasibility of a room temperature solution. The results of this note were presented an d discussed in the group SL/PO responsible for the powering scheme completion. The LHC Technical Co-ordination Committee at the "Technical Review" of October 1997 [3], [4], approved these results. |
id | cern-692083 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1998 |
record_format | invenio |
spelling | cern-6920832023-05-31T13:25:30Zhttp://cds.cern.ch/record/692083engBurla, PPedersen, JPreliminary Study: Powering the Transfer Lines from SPS to LHCAccelerators and Storage RingsAfter the decision to realise the transfer lines between SPS and LHC with room temperature magnets, a preliminary study of the powering scheme for these facilities has been performed. The purpose of t his note is to present the method used for this preliminary study and the results obtained. This study proved the feasibility of a room temperature solution. The results of this note were presented an d discussed in the group SL/PO responsible for the powering scheme completion. The LHC Technical Co-ordination Committee at the "Technical Review" of October 1997 [3], [4], approved these results.LHC-PROJECT-NOTE-153oai:cds.cern.ch:6920831998-07-22 |
spellingShingle | Accelerators and Storage Rings Burla, P Pedersen, J Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title | Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title_full | Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title_fullStr | Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title_full_unstemmed | Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title_short | Preliminary Study: Powering the Transfer Lines from SPS to LHC |
title_sort | preliminary study: powering the transfer lines from sps to lhc |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/692083 |
work_keys_str_mv | AT burlap preliminarystudypoweringthetransferlinesfromspstolhc AT pedersenj preliminarystudypoweringthetransferlinesfromspstolhc |