Cargando…

Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3

In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train combination by injection with RF deflectors into an isochronous ring has been successfully demonstrated in the preliminary phase of CTF3. A new method, based on beam frequency spectrum analysis, was exp...

Descripción completa

Detalles Bibliográficos
Autores principales: Caspers, Friedhelm, Corsini, R, Ferrari, A, Rinolfi, Louis, Royer, P, Rydberg, A, Tecker, F A
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/692797
_version_ 1780902138191282176
author Caspers, Friedhelm
Corsini, R
Ferrari, A
Rinolfi, Louis
Royer, P
Rydberg, A
Tecker, F A
author_facet Caspers, Friedhelm
Corsini, R
Ferrari, A
Rinolfi, Louis
Royer, P
Rydberg, A
Tecker, F A
author_sort Caspers, Friedhelm
collection CERN
description In the framework of the CLIC RF power source studies, the feasibility of the electron bunch train combination by injection with RF deflectors into an isochronous ring has been successfully demonstrated in the preliminary phase of CTF3. A new method, based on beam frequency spectrum analysis, was experimented to monitor this scheme. A coaxial pick-up and its read-out electronics were designed and mounted in the CTF3 ring to allow comparison of the amplitudes of five harmonics of the fundamental beam frequency (3 GHz) while combining the bunch trains. The commissioning of the monitor was a successful proof of principle for this new method, despite the short length of the bunch trains and the presence of parasitic signals associated to high-order waveguide modes propagating with the beam inside the pipe.
id cern-692797
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-6927972023-08-17T09:45:26Zhttp://cds.cern.ch/record/692797engCaspers, FriedhelmCorsini, RFerrari, ARinolfi, LouisRoyer, PRydberg, ATecker, F ADevelopment of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3Accelerators and Storage RingsIn the framework of the CLIC RF power source studies, the feasibility of the electron bunch train combination by injection with RF deflectors into an isochronous ring has been successfully demonstrated in the preliminary phase of CTF3. A new method, based on beam frequency spectrum analysis, was experimented to monitor this scheme. A coaxial pick-up and its read-out electronics were designed and mounted in the CTF3 ring to allow comparison of the amplitudes of five harmonics of the fundamental beam frequency (3 GHz) while combining the bunch trains. The commissioning of the monitor was a successful proof of principle for this new method, despite the short length of the bunch trains and the presence of parasitic signals associated to high-order waveguide modes propagating with the beam inside the pipe.CERN-AB-2003-096-RFCLIC-Note-587oai:cds.cern.ch:6927972003-12-01
spellingShingle Accelerators and Storage Rings
Caspers, Friedhelm
Corsini, R
Ferrari, A
Rinolfi, Louis
Royer, P
Rydberg, A
Tecker, F A
Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title_full Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title_fullStr Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title_full_unstemmed Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title_short Development of a Bunch Frequency Monitor for the Preliminary Phase of the CLIC Test Facility CTF3
title_sort development of a bunch frequency monitor for the preliminary phase of the clic test facility ctf3
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/692797
work_keys_str_mv AT caspersfriedhelm developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT corsinir developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT ferraria developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT rinolfilouis developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT royerp developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT rydberga developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3
AT teckerfa developmentofabunchfrequencymonitorforthepreliminaryphaseoftheclictestfacilityctf3