Cargando…

Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls

The new cryogenics controls for LHC (UNICOS) are implemented in an open architecture based on SCADA and PLC industrial components, with Ethernet as Fieldnetwork. Its development was outsourced to industry and since mid-2001 several applications have been produced and delivered for refrigerators in t...

Descripción completa

Detalles Bibliográficos
Autores principales: Gayet, P, Sicard, Claude Henri
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/693164
_version_ 1780902142740004864
author Gayet, P
Sicard, Claude Henri
author_facet Gayet, P
Sicard, Claude Henri
author_sort Gayet, P
collection CERN
description The new cryogenics controls for LHC (UNICOS) are implemented in an open architecture based on SCADA and PLC industrial components, with Ethernet as Fieldnetwork. Its development was outsourced to industry and since mid-2001 several applications have been produced and delivered for refrigerators in the accelerator and experiment domains. This has allowed to validatedetailed performance requirements in terms of communication and distributed architecture. The second phase of this project will involve its integration with the LHC accelerator controls, both at the information exchange level (alarms, data logging) and at the device configuration level. This phase takes advantage of the integrated design at PLC and SCADA level, leading to the use of configuration tools which can be easily connected to the generic device configuration model of the accelerator controls.
id cern-693164
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-6931642022-08-17T13:35:35Zhttp://cds.cern.ch/record/693164engGayet, PSicard, Claude HenriDeployment and Integration of Industrial Controls: The Case of LHC Cryogenics ControlsAccelerators and Storage RingsThe new cryogenics controls for LHC (UNICOS) are implemented in an open architecture based on SCADA and PLC industrial components, with Ethernet as Fieldnetwork. Its development was outsourced to industry and since mid-2001 several applications have been produced and delivered for refrigerators in the accelerator and experiment domains. This has allowed to validatedetailed performance requirements in terms of communication and distributed architecture. The second phase of this project will involve its integration with the LHC accelerator controls, both at the information exchange level (alarms, data logging) and at the device configuration level. This phase takes advantage of the integrated design at PLC and SCADA level, leading to the use of configuration tools which can be easily connected to the generic device configuration model of the accelerator controls.CERN-AB-2003-107-COoai:cds.cern.ch:6931642003-11-08
spellingShingle Accelerators and Storage Rings
Gayet, P
Sicard, Claude Henri
Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title_full Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title_fullStr Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title_full_unstemmed Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title_short Deployment and Integration of Industrial Controls: The Case of LHC Cryogenics Controls
title_sort deployment and integration of industrial controls: the case of lhc cryogenics controls
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/693164
work_keys_str_mv AT gayetp deploymentandintegrationofindustrialcontrolsthecaseoflhccryogenicscontrols
AT sicardclaudehenri deploymentandintegrationofindustrialcontrolsthecaseoflhccryogenicscontrols