Cargando…
TT2/TT10 Transfer Line Studies for the 14 GeV/C Continuous Transfer
Since several years the values of the emittance of the fixed-target beam measured with SEM-wires in the TT2 line and with SEM-grids in the TT10 line were in disagreement by up to 50 %. The measurement of the beam emittance by means of beam profile monitors (BPMs) relies on the knowledge of the dispe...
Autores principales: | Arduini, Gianluigi, Crockford, G, Giovannozzi, Massimo, Hanke, K, Manglunki, Django, Martini, M, Métral, G, Niquille, C |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/693924 |
Ejemplares similares
-
Betatron and Dispersion Matching of the TT2/TT10 Transfer Line for the 26 GeV/C Fast Extraction
por: Arduini, Gianluigi, et al.
Publicado: (1999) -
TT2/TT10 transfer line studies for the 14 GEV/C continuous transfer
por: Arduini, G, et al.
Publicado: (1999) -
Betatron and Dispersion Matching of the TT2/TT10 Transfer Line for the Fixed-Target Lead Ion Beam
por: Arduini, Gianluigi, et al.
Publicado: (1999) -
Betatron and dispersion matching of the TT2/TT10 transfer line for the 26 GeV/C fast extraction
por: Arduini, G, et al.
Publicado: (1999) -
Summary of the TT2/TT10 Transfer Line Studies in the Years 2001 and 2002
por: Arduini, Gianluigi, et al.
Publicado: (2003)