Beam Dump TIDV #1 - Vacuum Failure of 17 Oct. 97
A vacuum leak on the internal beam dump TIDV precipitated its replacement in the LSS1 on Monday the 20th of October 1997, the SPS consequently being shut down for three days. The dump had fulfilled its design function since it was installed in the SPS at the beginning of 1988. Prior to the intervent...
Autores principales: | Ross, M, Péraire, S |
---|---|
Lenguaje: | eng |
Publicado: |
1997
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702411 |
Ejemplares similares
-
Summary of Reports on TIDV Beam Dump Repairs
por: Ross, M
Publicado: (1998) -
Décharge sur le dump interne TIDV du SPS de faisceaux destinés au LHC
por: Péraire, S
Publicado: (1996) -
Technical specification of the aluminium alloy for the internal beam dump (TIDV) of the SPS
por: CERN, Geneva
Publicado: (1979) -
Design Studies of the LHC beam dump
por: Bruno, L, et al.
Publicado: (1999) -
Design studies of the LHC beam dump
por: Zazula, J M, et al.
Publicado: (1997)