The LEP startup Plan, 1998

The startup planning for LEP in 1998 is presented. Operation this year is planned with the 102/90o lattice. The machine will be commissioned with this optics and operation for physics at 45 GeV fo r the Zo calibration data will be attempted. The 90/90o lattice, as a 'backup' solution for t...

Descripción completa

Detalles Bibliográficos
Autor principal: Collier, Paul
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/702447
_version_ 1780902294797156352
author Collier, Paul
author_facet Collier, Paul
author_sort Collier, Paul
collection CERN
description The startup planning for LEP in 1998 is presented. Operation this year is planned with the 102/90o lattice. The machine will be commissioned with this optics and operation for physics at 45 GeV fo r the Zo calibration data will be attempted. The 90/90o lattice, as a 'backup' solution for the Zo running, will only be commissioned in case of dire need. As usual there have been changes to the machine during the shutdown. The most important of which is the re-arrangement of IP6 with the installation of 8 new SC-RF modules there. IP6 and IP2 are now similar. 36 CU-RF cavities have been removed from the machine. In addition the polarisation wiggler positions have been changed in IP3 and IP7 to protect the separators from synchrotron radiation produced by the wigglers. Finally the vertical aperture of the vacuum chamber in all four experiments has been reduced to 55 mm.
id cern-702447
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-7024472023-05-11T12:03:24Zhttp://cds.cern.ch/record/702447engCollier, PaulThe LEP startup Plan, 1998Accelerators and Storage RingsThe startup planning for LEP in 1998 is presented. Operation this year is planned with the 102/90o lattice. The machine will be commissioned with this optics and operation for physics at 45 GeV fo r the Zo calibration data will be attempted. The 90/90o lattice, as a 'backup' solution for the Zo running, will only be commissioned in case of dire need. As usual there have been changes to the machine during the shutdown. The most important of which is the re-arrangement of IP6 with the installation of 8 new SC-RF modules there. IP6 and IP2 are now similar. 36 CU-RF cavities have been removed from the machine. In addition the polarisation wiggler positions have been changed in IP3 and IP7 to protect the separators from synchrotron radiation produced by the wigglers. Finally the vertical aperture of the vacuum chamber in all four experiments has been reduced to 55 mm.SL-Note-98-028-OPoai:cds.cern.ch:7024471998-04-24
spellingShingle Accelerators and Storage Rings
Collier, Paul
The LEP startup Plan, 1998
title The LEP startup Plan, 1998
title_full The LEP startup Plan, 1998
title_fullStr The LEP startup Plan, 1998
title_full_unstemmed The LEP startup Plan, 1998
title_short The LEP startup Plan, 1998
title_sort lep startup plan, 1998
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702447
work_keys_str_mv AT collierpaul thelepstartupplan1998
AT collierpaul lepstartupplan1998