Cargando…
Summary of Reports on TIDV Beam Dump Repairs
A vacuum leak on the internal beam dump TIDV#1 precipitated its replacement in the LSS1 on Monday the 20th. October 1997. The second spare assembly designated TIDV#3 was found to have developed a crac k in a longitudinal weld during its ten years in storage. At least one spare had to be functional b...
Autor principal: | Ross, M |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702456 |
Ejemplares similares
-
Beam Dump TIDV #1 - Vacuum Failure of 17 Oct. 97
por: Ross, M, et al.
Publicado: (1997) -
Technical specification of the aluminium alloy for the internal beam dump (TIDV) of the SPS
por: CERN, Geneva
Publicado: (1979) -
Décharge sur le dump interne TIDV du SPS de faisceaux destinés au LHC
por: Péraire, S
Publicado: (1996) -
Update and Summary of the Dependability Assessment of the LHC Beam Dumping System
por: Filippini, R, et al.
Publicado: (2007) -
Sigraflex® Studies for LHC CERN Beam Dump: Summary and Perspective
por: Heredia, Jorge, et al.
Publicado: (2021)