Cargando…

New working point at 22 GeV.

A usable working point for accumulation at 22 GeV is constrained by the need to accommodate a sizeable and changing coherent tune shift while avoiding harmful resonances. Only if this is possible will the fundamental limit - the transverse mode coupling instability (TMCI) - be reached. The aim of th...

Descripción completa

Detalles Bibliográficos
Autores principales: Cornelis, K, Lamont, M, Meddahi, M
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/702489
_version_ 1780902302412963840
author Cornelis, K
Lamont, M
Meddahi, M
author_facet Cornelis, K
Lamont, M
Meddahi, M
author_sort Cornelis, K
collection CERN
description A usable working point for accumulation at 22 GeV is constrained by the need to accommodate a sizeable and changing coherent tune shift while avoiding harmful resonances. Only if this is possible will the fundamental limit - the transverse mode coupling instability (TMCI) - be reached. The aim of the MD was to attempt to push the low intensity tunes towards the 1/3 integer, raise Qs somewhat and cross the potentially limiting 2Qs synchro-betatron resonance at low intensity. This strategy proved to be successful and over 1 mA per bunch was accumulated in a single beam of 4 bunches. Attempts were also made to put the tunes above the 1/3 integer and to raise the synchrotron tune.
id cern-702489
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-7024892023-05-11T12:03:26Zhttp://cds.cern.ch/record/702489engCornelis, KLamont, MMeddahi, MNew working point at 22 GeV.Accelerators and Storage RingsA usable working point for accumulation at 22 GeV is constrained by the need to accommodate a sizeable and changing coherent tune shift while avoiding harmful resonances. Only if this is possible will the fundamental limit - the transverse mode coupling instability (TMCI) - be reached. The aim of the MD was to attempt to push the low intensity tunes towards the 1/3 integer, raise Qs somewhat and cross the potentially limiting 2Qs synchro-betatron resonance at low intensity. This strategy proved to be successful and over 1 mA per bunch was accumulated in a single beam of 4 bunches. Attempts were also made to put the tunes above the 1/3 integer and to raise the synchrotron tune.SL-Note-98-067-MDoai:cds.cern.ch:7024891998-11-17
spellingShingle Accelerators and Storage Rings
Cornelis, K
Lamont, M
Meddahi, M
New working point at 22 GeV.
title New working point at 22 GeV.
title_full New working point at 22 GeV.
title_fullStr New working point at 22 GeV.
title_full_unstemmed New working point at 22 GeV.
title_short New working point at 22 GeV.
title_sort new working point at 22 gev.
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702489
work_keys_str_mv AT cornelisk newworkingpointat22gev
AT lamontm newworkingpointat22gev
AT meddahim newworkingpointat22gev