Cargando…
New working point at 22 GeV.
A usable working point for accumulation at 22 GeV is constrained by the need to accommodate a sizeable and changing coherent tune shift while avoiding harmful resonances. Only if this is possible will the fundamental limit - the transverse mode coupling instability (TMCI) - be reached. The aim of th...
Autores principales: | Cornelis, K, Lamont, M, Meddahi, M |
---|---|
Lenguaje: | eng |
Publicado: |
1998
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702489 |
Ejemplares similares
-
Working point at 22 GeV
por: Cornelis, Karel
Publicado: (1997) -
Runs 362 (22 GeV) and 372 (26 GeV) Ring 1
por: Potter, K M
Publicado: (1973) -
Runs 434, 460 (26 GeV), Run 470 (22 GeV), Run 492 (11 GeV)
por: Potter, K M
Publicado: (1974) -
"ISR Running-In, Run no. 66: 22 GeV, 4 bunches, PS Q-jump, Working point
por: Hansen, S
Publicado: (1971) -
Run no. 124, 22.11.1971, 4 bunches, 22 GeV, Working line 22 FB
por: Hansen, S, et al.
Publicado: (1971)