Cargando…

Analysis of the performance of the SPS extraction channel equipment in 1997

In 1997 the SPS ran with high proton intensities (peak above 4.8x1013 protons per pulse) at 450 GeV/c, essential for the neutrino physics program. The SPS also provided lepton beams at 22 GeV for injection into LEP. The equipment used to extract the proton beams is generally very sensitive to the se...

Descripción completa

Detalles Bibliográficos
Autores principales: Balhan, B, Goddard, B
Lenguaje:eng
Publicado: 1998
Materias:
Acceso en línea:http://cds.cern.ch/record/702496
_version_ 1780902303703760896
author Balhan, B
Goddard, B
author_facet Balhan, B
Goddard, B
author_sort Balhan, B
collection CERN
description In 1997 the SPS ran with high proton intensities (peak above 4.8x1013 protons per pulse) at 450 GeV/c, essential for the neutrino physics program. The SPS also provided lepton beams at 22 GeV for injection into LEP. The equipment used to extract the proton beams is generally very sensitive to the set-up and state of both the SPS machine and the hardware itself; this note contains an analysis of the performance of this extraction equipment in 1997. We describe the modifications to the hardware installations made during the 1996-1997 shutdown, the problems encountered in operation in 1997, the measurements and investigations undertaken, and the conclusions reached. Recommendations are made concerning changes to the hardware installations and operation.
id cern-702496
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1998
record_format invenio
spelling cern-7024962023-05-11T12:03:26Zhttp://cds.cern.ch/record/702496engBalhan, BGoddard, BAnalysis of the performance of the SPS extraction channel equipment in 1997Accelerators and Storage RingsIn 1997 the SPS ran with high proton intensities (peak above 4.8x1013 protons per pulse) at 450 GeV/c, essential for the neutrino physics program. The SPS also provided lepton beams at 22 GeV for injection into LEP. The equipment used to extract the proton beams is generally very sensitive to the set-up and state of both the SPS machine and the hardware itself; this note contains an analysis of the performance of this extraction equipment in 1997. We describe the modifications to the hardware installations made during the 1996-1997 shutdown, the problems encountered in operation in 1997, the measurements and investigations undertaken, and the conclusions reached. Recommendations are made concerning changes to the hardware installations and operation.SL-Note-98-074-MSoai:cds.cern.ch:7024961998-12-03
spellingShingle Accelerators and Storage Rings
Balhan, B
Goddard, B
Analysis of the performance of the SPS extraction channel equipment in 1997
title Analysis of the performance of the SPS extraction channel equipment in 1997
title_full Analysis of the performance of the SPS extraction channel equipment in 1997
title_fullStr Analysis of the performance of the SPS extraction channel equipment in 1997
title_full_unstemmed Analysis of the performance of the SPS extraction channel equipment in 1997
title_short Analysis of the performance of the SPS extraction channel equipment in 1997
title_sort analysis of the performance of the sps extraction channel equipment in 1997
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702496
work_keys_str_mv AT balhanb analysisoftheperformanceofthespsextractionchannelequipmentin1997
AT goddardb analysisoftheperformanceofthespsextractionchannelequipmentin1997