Cargando…

SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility

For the LHC two new transfer lines will be built. TI 2 leaves the present West extraction zone, while TI 8 involves the construction of a new extraction channel (East Extraction) in LSS4. In addition there is a proposal to construct a long baseline neutrino facility based on the east extraction zone...

Descripción completa

Detalles Bibliográficos
Autores principales: Cennini, E, Collier, Paul, Hilaire, A, Jacot, C, Jansson, U, Jonker, M, Mertens, V, Proudlock, Paul, Rau, G, Silari, Marco, Stevenson, G R, Weisse, E
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/702511
_version_ 1780902306489827328
author Cennini, E
Collier, Paul
Hilaire, A
Jacot, C
Jansson, U
Jonker, M
Mertens, V
Proudlock, Paul
Rau, G
Silari, Marco
Stevenson, G R
Weisse, E
author_facet Cennini, E
Collier, Paul
Hilaire, A
Jacot, C
Jansson, U
Jonker, M
Mertens, V
Proudlock, Paul
Rau, G
Silari, Marco
Stevenson, G R
Weisse, E
author_sort Cennini, E
collection CERN
description For the LHC two new transfer lines will be built. TI 2 leaves the present West extraction zone, while TI 8 involves the construction of a new extraction channel (East Extraction) in LSS4. In addition there is a proposal to construct a long baseline neutrino facility based on the east extraction zone. The construction of these will require significant modifications to the SPS safety chain system. The proposed modifications are given, together with the associated machine interlocks for each access area. The restrictions that will apply to access in certain areas while operation continues in others will be detailed, together with any open questions, which remain.
id cern-702511
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-7025112023-05-11T12:03:27Zhttp://cds.cern.ch/record/702511engCennini, ECollier, PaulHilaire, AJacot, CJansson, UJonker, MMertens, VProudlock, PaulRau, GSilari, MarcoStevenson, G RWeisse, ESPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino FacilityAccelerators and Storage RingsFor the LHC two new transfer lines will be built. TI 2 leaves the present West extraction zone, while TI 8 involves the construction of a new extraction channel (East Extraction) in LSS4. In addition there is a proposal to construct a long baseline neutrino facility based on the east extraction zone. The construction of these will require significant modifications to the SPS safety chain system. The proposed modifications are given, together with the associated machine interlocks for each access area. The restrictions that will apply to access in certain areas while operation continues in others will be detailed, together with any open questions, which remain.SL-Note-99-010-SLIoai:cds.cern.ch:7025111999-01-11
spellingShingle Accelerators and Storage Rings
Cennini, E
Collier, Paul
Hilaire, A
Jacot, C
Jansson, U
Jonker, M
Mertens, V
Proudlock, Paul
Rau, G
Silari, Marco
Stevenson, G R
Weisse, E
SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title_full SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title_fullStr SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title_full_unstemmed SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title_short SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
title_sort sps safety chain modification for the lhc transfer lines and the long baseline neutrino facility
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702511
work_keys_str_mv AT cenninie spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT collierpaul spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT hilairea spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT jacotc spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT janssonu spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT jonkerm spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT mertensv spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT proudlockpaul spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT raug spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT silarimarco spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT stevensongr spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility
AT weissee spssafetychainmodificationforthelhctransferlinesandthelongbaselineneutrinofacility