Cargando…
SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
For the LHC two new transfer lines will be built. TI 2 leaves the present West extraction zone, while TI 8 involves the construction of a new extraction channel (East Extraction) in LSS4. In addition there is a proposal to construct a long baseline neutrino facility based on the east extraction zone...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702511 |