Cargando…
SPS Safety Chain Modification for the LHC Transfer Lines and the Long Baseline Neutrino Facility
For the LHC two new transfer lines will be built. TI 2 leaves the present West extraction zone, while TI 8 involves the construction of a new extraction channel (East Extraction) in LSS4. In addition there is a proposal to construct a long baseline neutrino facility based on the east extraction zone...
Autores principales: | Cennini, E, Collier, Paul, Hilaire, A, Jacot, C, Jansson, U, Jonker, M, Mertens, V, Proudlock, Paul, Rau, G, Silari, Marco, Stevenson, G R, Weisse, E |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702511 |
Ejemplares similares
-
Rapport Préliminaire de sureté du LHC
por: Rau, Gunter, et al.
Publicado: (1999) -
An Experimental Area for Short Baseline Neutrino Physics on the CERN Neutrino Beam to Gran Sasso
por: Baldy, J L, et al.
Publicado: (1998) -
Results of a beam dump experiment at the CERN SPS neutrino facility
por: Hansl-Kozanecka, Traudl, et al.
Publicado: (1978) -
The SPS as accelerator of Pb$^{82+}$ ions
por: Faugier, A, et al.
Publicado: (1995) -
Overview and status of the Long Baseline Neutrino Facility cryogenics system
por: Haaf, K, et al.
Publicado: (2019)