Cargando…

Implication of the displacement of the T1 primary target in the west area at the CERN SPS

As soon as the transfer line T12 for proton injection into the LHC must be installed, the T1 primary target has to be at least partly dismantled, as its shielding would block the passage of the beam. Even though the installation of T12 is only foreseen for later, in view of sharing of workload relat...

Descripción completa

Detalles Bibliográficos
Autor principal: Gatignon, L
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/702519
_version_ 1780902307978805248
author Gatignon, L
author_facet Gatignon, L
author_sort Gatignon, L
collection CERN
description As soon as the transfer line T12 for proton injection into the LHC must be installed, the T1 primary target has to be at least partly dismantled, as its shielding would block the passage of the beam. Even though the installation of T12 is only foreseen for later, in view of sharing of workload related to the SLI project, it is preferred to move the primary production target T1 for the West Area to its new position already in the shutdown 1999/2000. The new position of the target requires major modifications of support structures in TCC6, of the transfer line towards T1 and of a more than 500 metres long section of the H3 secondary beam in the West Area, all to be completed in the 1999/2000 shutdown. To allow the work to be finished in time, part of it (including some civil engineering in TT4) is already done in the 1998/99 shutdown. In this memo the necessary modifications are described, cost estimates are given and a planning is provided.
id cern-702519
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
record_format invenio
spelling cern-7025192023-05-11T12:03:27Zhttp://cds.cern.ch/record/702519engGatignon, LImplication of the displacement of the T1 primary target in the west area at the CERN SPSAccelerators and Storage RingsAs soon as the transfer line T12 for proton injection into the LHC must be installed, the T1 primary target has to be at least partly dismantled, as its shielding would block the passage of the beam. Even though the installation of T12 is only foreseen for later, in view of sharing of workload related to the SLI project, it is preferred to move the primary production target T1 for the West Area to its new position already in the shutdown 1999/2000. The new position of the target requires major modifications of support structures in TCC6, of the transfer line towards T1 and of a more than 500 metres long section of the H3 secondary beam in the West Area, all to be completed in the 1999/2000 shutdown. To allow the work to be finished in time, part of it (including some civil engineering in TT4) is already done in the 1998/99 shutdown. In this memo the necessary modifications are described, cost estimates are given and a planning is provided.SL-Note-99-019-EAoai:cds.cern.ch:7025191999-03-15
spellingShingle Accelerators and Storage Rings
Gatignon, L
Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title_full Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title_fullStr Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title_full_unstemmed Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title_short Implication of the displacement of the T1 primary target in the west area at the CERN SPS
title_sort implication of the displacement of the t1 primary target in the west area at the cern sps
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702519
work_keys_str_mv AT gatignonl implicationofthedisplacementofthet1primarytargetinthewestareaatthecernsps