Cargando…

Survey of the Short Straight Sections in the SPS for the Impedance Reduction Programme

A survey has been made of the short straight sections in the SPS machine. From this the type of pumping port shield to fit has been determined. At the same time, places where unnecessary vacuum chamber section changes occur have been identified and replacement chambers specified. In some cases, shie...

Descripción completa

Detalles Bibliográficos
Autores principales: Collier, Paul, Spinks, Alan
Lenguaje:eng
Publicado: 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/702531
Descripción
Sumario:A survey has been made of the short straight sections in the SPS machine. From this the type of pumping port shield to fit has been determined. At the same time, places where unnecessary vacuum chamber section changes occur have been identified and replacement chambers specified. In some cases, shielding of the pumping port is not required, or special equipment on the short straight section prevents installation. Out of a total of 216 straight sections, 176 can be fitted with shields. The remaining 40 will be attacked individually.