Cargando…
Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam
TRANSVERSE EMITTANCE PRESERVATION IS A MAJOR CONCERN OF THE LHC INJECTOR CHAIN. MINIMISATION OF THE BLOW-UP DUE TO MISMATCH AT INJECTION INTO THE SPS IS THEREFORE MANDATORY. WHILE THE TRANSVERSE POSITIONN OF THE BEAM IN THE SPS INJECTION LINE IS MONITORED BUNCH BY BUNCH BY AN OTR (OPTICAL TRANSITION...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702533 |
_version_ | 1780902310356975616 |
---|---|
author | Arduini, Gianluigi Colchester, R J Ferioli, G Giovanazzi, M Gras, J J Hanke, K Hopkins, D J Jung, R Manglunki, Django Martini, M |
author_facet | Arduini, Gianluigi Colchester, R J Ferioli, G Giovanazzi, M Gras, J J Hanke, K Hopkins, D J Jung, R Manglunki, Django Martini, M |
author_sort | Arduini, Gianluigi |
collection | CERN |
description | TRANSVERSE EMITTANCE PRESERVATION IS A MAJOR CONCERN OF THE LHC INJECTOR CHAIN. MINIMISATION OF THE BLOW-UP DUE TO MISMATCH AT INJECTION INTO THE SPS IS THEREFORE MANDATORY. WHILE THE TRANSVERSE POSITIONN OF THE BEAM IN THE SPS INJECTION LINE IS MONITORED BUNCH BY BUNCH BY AN OTR (OPTICAL TRANSITION RADIATION) SCREEN AND A FAST CCD (CHARGED COUPLED DEVICE) CAMERA, THE PHASE SPACE MATCHING AT INJECTION IS MONITORED BY AN OTR BASED MISMATCH MONITOR IN THE SPS RING. ORTHOGONAL TUNING KNOBS WERE DEVELOPED TO TUNE INDEPENDENTLY TWISS PARAMETERS, DISPERSION AND DISPERSION DERIVATIVE. IN THIS PAPER WE DESCRIBE THE MISMATCH CORRECTION MECHANISM AS WELL AS THE TWO MONITORING SYSTEMS. WE REPORT ON FIRST MEASUREMENTS WHICH WERE CARRIED OUT DURING THE 1998 SPS RUN. |
id | cern-702533 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
record_format | invenio |
spelling | cern-7025332023-05-11T12:03:28Zhttp://cds.cern.ch/record/702533engArduini, GianluigiColchester, R JFerioli, GGiovanazzi, MGras, J JHanke, KHopkins, D JJung, RManglunki, DjangoMartini, MMismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beamAccelerators and Storage RingsTRANSVERSE EMITTANCE PRESERVATION IS A MAJOR CONCERN OF THE LHC INJECTOR CHAIN. MINIMISATION OF THE BLOW-UP DUE TO MISMATCH AT INJECTION INTO THE SPS IS THEREFORE MANDATORY. WHILE THE TRANSVERSE POSITIONN OF THE BEAM IN THE SPS INJECTION LINE IS MONITORED BUNCH BY BUNCH BY AN OTR (OPTICAL TRANSITION RADIATION) SCREEN AND A FAST CCD (CHARGED COUPLED DEVICE) CAMERA, THE PHASE SPACE MATCHING AT INJECTION IS MONITORED BY AN OTR BASED MISMATCH MONITOR IN THE SPS RING. ORTHOGONAL TUNING KNOBS WERE DEVELOPED TO TUNE INDEPENDENTLY TWISS PARAMETERS, DISPERSION AND DISPERSION DERIVATIVE. IN THIS PAPER WE DESCRIBE THE MISMATCH CORRECTION MECHANISM AS WELL AS THE TWO MONITORING SYSTEMS. WE REPORT ON FIRST MEASUREMENTS WHICH WERE CARRIED OUT DURING THE 1998 SPS RUN.SL-Note-99-032-MDoai:cds.cern.ch:7025331999-06-10 |
spellingShingle | Accelerators and Storage Rings Arduini, Gianluigi Colchester, R J Ferioli, G Giovanazzi, M Gras, J J Hanke, K Hopkins, D J Jung, R Manglunki, Django Martini, M Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title | Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title_full | Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title_fullStr | Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title_full_unstemmed | Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title_short | Mismatch measurement and correction tools for the PS-SPS transfer of the 26GeV/C LHC beam |
title_sort | mismatch measurement and correction tools for the ps-sps transfer of the 26gev/c lhc beam |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/702533 |
work_keys_str_mv | AT arduinigianluigi mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT colchesterrj mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT feriolig mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT giovanazzim mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT grasjj mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT hankek mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT hopkinsdj mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT jungr mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT manglunkidjango mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam AT martinim mismatchmeasurementandcorrectiontoolsforthepsspstransferofthe26gevclhcbeam |