Long Term Precision Measurements on GPS and IRIG-B Equipment
During November 1999 the progress report of the TimWG was presented to the LHC PLC. The report contained a list of short term and medium term tests that should be completed during 2000. The PLC concluded that "The TimWG should continue its work with the objective of producing a final definition...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702605 |
_version_ | 1780902323693813760 |
---|---|
author | Antfolk, C Beetham, G Ribes, J B Williamsson, J |
author_facet | Antfolk, C Beetham, G Ribes, J B Williamsson, J |
author_sort | Antfolk, C |
collection | CERN |
description | During November 1999 the progress report of the TimWG was presented to the LHC PLC. The report contained a list of short term and medium term tests that should be completed during 2000. The PLC concluded that "The TimWG should continue its work with the objective of producing a final definition of the timing before the end of 2000". The first two items on the list were "GPS time synchronisation measurements" and "IRIG-B data transmission tests". This note contains the result of the tests that have so far been performed and they will be presented to the TimWG. |
id | cern-702605 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2000 |
record_format | invenio |
spelling | cern-7026052023-05-11T12:03:31Zhttp://cds.cern.ch/record/702605engAntfolk, CBeetham, GRibes, J BWilliamsson, JLong Term Precision Measurements on GPS and IRIG-B EquipmentAccelerators and Storage RingsDuring November 1999 the progress report of the TimWG was presented to the LHC PLC. The report contained a list of short term and medium term tests that should be completed during 2000. The PLC concluded that "The TimWG should continue its work with the objective of producing a final definition of the timing before the end of 2000". The first two items on the list were "GPS time synchronisation measurements" and "IRIG-B data transmission tests". This note contains the result of the tests that have so far been performed and they will be presented to the TimWG.SL-Note-2000-037-COoai:cds.cern.ch:7026052000-07-21 |
spellingShingle | Accelerators and Storage Rings Antfolk, C Beetham, G Ribes, J B Williamsson, J Long Term Precision Measurements on GPS and IRIG-B Equipment |
title | Long Term Precision Measurements on GPS and IRIG-B Equipment |
title_full | Long Term Precision Measurements on GPS and IRIG-B Equipment |
title_fullStr | Long Term Precision Measurements on GPS and IRIG-B Equipment |
title_full_unstemmed | Long Term Precision Measurements on GPS and IRIG-B Equipment |
title_short | Long Term Precision Measurements on GPS and IRIG-B Equipment |
title_sort | long term precision measurements on gps and irig-b equipment |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/702605 |
work_keys_str_mv | AT antfolkc longtermprecisionmeasurementsongpsandirigbequipment AT beethamg longtermprecisionmeasurementsongpsandirigbequipment AT ribesjb longtermprecisionmeasurementsongpsandirigbequipment AT williamssonj longtermprecisionmeasurementsongpsandirigbequipment |