Cargando…
Alignment and girder position of MSE septa in the new LSS4 extraction channel of the SPS
For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS)facility, a new fast-extraction system is being constructed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged...
Autores principales: | Balhan, B, Goddard, B, Rizzo, A, Weterings, W |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702695 |
Ejemplares similares
-
Design and installation of the MSE septum system in the new LSS4 extraction channel of the SPS
por: Balhan, B, et al.
Publicado: (2003) -
Modifications to the SPS LSS6 Septa for LHC and the SPS Septa Diluters
por: Borburgh, Y, et al.
Publicado: (2007) -
The Septum Magnet System of the New Fast Extraction Channel of the SPS at CERN
por: Balhan, B, et al.
Publicado: (2003) -
Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC
por: Balhan, B, et al.
Publicado: (2007) -
Automatisation of the SPS electrostatic septa alignment
por: Hirlaender, Simon, et al.
Publicado: (2019)