Cargando…

Approaching nominal longitudinal parameters with a single LHC batch in the SPS

Progress made in obtaining the nominal LHC parameters during the first three MDs in 2002 is described. At the end of the third MD nominal longitudinal parameters (bunch length 1.75 ns and emittance 0.46 eVs) were obtained for a single batch with an intensity of 6.7 x 1012 at 450 GeV as a result of i...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Bohl, T, Linnecar, Trevor Paul R, Shaposhnikova, Elena, Tückmantel, Joachim
Lenguaje:eng
Publicado: 2002
Materias:
Acceso en línea:http://cds.cern.ch/record/702709
_version_ 1780902342444449792
author Baudrenghien, P
Bohl, T
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
author_facet Baudrenghien, P
Bohl, T
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
author_sort Baudrenghien, P
collection CERN
description Progress made in obtaining the nominal LHC parameters during the first three MDs in 2002 is described. At the end of the third MD nominal longitudinal parameters (bunch length 1.75 ns and emittance 0.46 eVs) were obtained for a single batch with an intensity of 6.7 x 1012 at 450 GeV as a result of improvements in the feedback and feedforward systems made in the second MD and special settings, which include an optimised 200 MHz voltage programme, operation of the 800 MHz RF system through the cycle together with a small controlled emittance blow-up on the flat bottom.
id cern-702709
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2002
record_format invenio
spelling cern-7027092023-08-16T09:16:41Zhttp://cds.cern.ch/record/702709engBaudrenghien, PBohl, TLinnecar, Trevor Paul RShaposhnikova, ElenaTückmantel, JoachimApproaching nominal longitudinal parameters with a single LHC batch in the SPSAccelerators and Storage RingsProgress made in obtaining the nominal LHC parameters during the first three MDs in 2002 is described. At the end of the third MD nominal longitudinal parameters (bunch length 1.75 ns and emittance 0.46 eVs) were obtained for a single batch with an intensity of 6.7 x 1012 at 450 GeV as a result of improvements in the feedback and feedforward systems made in the second MD and special settings, which include an optimised 200 MHz voltage programme, operation of the 800 MHz RF system through the cycle together with a small controlled emittance blow-up on the flat bottom.SL-Note-2002-029-MDoai:cds.cern.ch:7027092002-09-04
spellingShingle Accelerators and Storage Rings
Baudrenghien, P
Bohl, T
Linnecar, Trevor Paul R
Shaposhnikova, Elena
Tückmantel, Joachim
Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title_full Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title_fullStr Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title_full_unstemmed Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title_short Approaching nominal longitudinal parameters with a single LHC batch in the SPS
title_sort approaching nominal longitudinal parameters with a single lhc batch in the sps
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702709
work_keys_str_mv AT baudrenghienp approachingnominallongitudinalparameterswithasinglelhcbatchinthesps
AT bohlt approachingnominallongitudinalparameterswithasinglelhcbatchinthesps
AT linnecartrevorpaulr approachingnominallongitudinalparameterswithasinglelhcbatchinthesps
AT shaposhnikovaelena approachingnominallongitudinalparameterswithasinglelhcbatchinthesps
AT tuckmanteljoachim approachingnominallongitudinalparameterswithasinglelhcbatchinthesps