Cargando…
Prototyping Real-Time Control in the SPS
Real-time control of beam related parameters will be required in the LHC. In order to gain experience of the issues involved in implementing distributed real-time control over large distances, a prototype local orbit feedback system is being developed in the SPS. This will use 6 pickups, each equipp...
Autores principales: | , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702749 |
_version_ | 1780902349448937472 |
---|---|
author | Andersson, J Chtcherbakov, S Jensen, L Jones, R Lamont, M Wenninger, J Wijnands, Thijs |
author_facet | Andersson, J Chtcherbakov, S Jensen, L Jones, R Lamont, M Wenninger, J Wijnands, Thijs |
author_sort | Andersson, J |
collection | CERN |
description | Real-time control of beam related parameters will be required in the LHC. In order to gain experience of the issues involved in implementing distributed real-time control over large distances, a prototype local orbit feedback system is being developed in the SPS. This will use 6 pickups, each equipped with the full LHC acquisition electronics chain and linked to a real-time communication and feedback system.<br> This reports summarises the .rst tests performed with this system in October 2002, where the data from four pickups was successfully acquired and displayed at 10 Hz in the control room. |
id | cern-702749 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2003 |
record_format | invenio |
spelling | cern-7027492023-02-17T10:08:16Zhttp://cds.cern.ch/record/702749engAndersson, JChtcherbakov, SJensen, LJones, RLamont, MWenninger, JWijnands, ThijsPrototyping Real-Time Control in the SPSAccelerators and Storage RingsReal-time control of beam related parameters will be required in the LHC. In order to gain experience of the issues involved in implementing distributed real-time control over large distances, a prototype local orbit feedback system is being developed in the SPS. This will use 6 pickups, each equipped with the full LHC acquisition electronics chain and linked to a real-time communication and feedback system.<br> This reports summarises the .rst tests performed with this system in October 2002, where the data from four pickups was successfully acquired and displayed at 10 Hz in the control room.AB-Note-2003-019-OPoai:cds.cern.ch:7027492003-03-01 |
spellingShingle | Accelerators and Storage Rings Andersson, J Chtcherbakov, S Jensen, L Jones, R Lamont, M Wenninger, J Wijnands, Thijs Prototyping Real-Time Control in the SPS |
title | Prototyping Real-Time Control in the SPS |
title_full | Prototyping Real-Time Control in the SPS |
title_fullStr | Prototyping Real-Time Control in the SPS |
title_full_unstemmed | Prototyping Real-Time Control in the SPS |
title_short | Prototyping Real-Time Control in the SPS |
title_sort | prototyping real-time control in the sps |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/702749 |
work_keys_str_mv | AT anderssonj prototypingrealtimecontrolinthesps AT chtcherbakovs prototypingrealtimecontrolinthesps AT jensenl prototypingrealtimecontrolinthesps AT jonesr prototypingrealtimecontrolinthesps AT lamontm prototypingrealtimecontrolinthesps AT wenningerj prototypingrealtimecontrolinthesps AT wijnandsthijs prototypingrealtimecontrolinthesps |