Cargando…
A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
increase the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measur...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2003
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/702814 |
_version_ | 1780902361874563072 |
---|---|
author | Gasior, M |
author_facet | Gasior, M |
author_sort | Gasior, M |
collection | CERN |
description | increase the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measurement of proton beams by calibration with a precise current source. |
id | cern-702814 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2003 |
record_format | invenio |
spelling | cern-7028142023-02-17T10:08:21Zhttp://cds.cern.ch/record/702814engGasior, MA proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSBAccelerators and Storage Ringsincrease the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measurement of proton beams by calibration with a precise current source.AB-Note-2003-082-BDIoai:cds.cern.ch:7028142003-10-22 |
spellingShingle | Accelerators and Storage Rings Gasior, M A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title | A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title_full | A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title_fullStr | A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title_full_unstemmed | A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title_short | A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB |
title_sort | proposal for an inductive pick-up for measuring the position and current of proton beams in the transfer lines between the linac 2 and the psb |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/702814 |
work_keys_str_mv | AT gasiorm aproposalforaninductivepickupformeasuringthepositionandcurrentofprotonbeamsinthetransferlinesbetweenthelinac2andthepsb AT gasiorm proposalforaninductivepickupformeasuringthepositionandcurrentofprotonbeamsinthetransferlinesbetweenthelinac2andthepsb |