Cargando…

A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB

increase the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measur...

Descripción completa

Detalles Bibliográficos
Autor principal: Gasior, M
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/702814
_version_ 1780902361874563072
author Gasior, M
author_facet Gasior, M
author_sort Gasior, M
collection CERN
description increase the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measurement of proton beams by calibration with a precise current source.
id cern-702814
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-7028142023-02-17T10:08:21Zhttp://cds.cern.ch/record/702814engGasior, MA proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSBAccelerators and Storage Ringsincrease the high cut-off by a decade. It is expected to be less sensitive to electromagnetic interference and have better noise performance. The whole system could be run on a single DSC and would have a much simplified timing system. In addition it could provide an accurate absolute current measurement of proton beams by calibration with a precise current source.AB-Note-2003-082-BDIoai:cds.cern.ch:7028142003-10-22
spellingShingle Accelerators and Storage Rings
Gasior, M
A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title_full A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title_fullStr A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title_full_unstemmed A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title_short A proposal for an Inductive Pick-Up for Measuring the Position and Current of Proton Beams in the Transfer Lines between the Linac 2 and the PSB
title_sort proposal for an inductive pick-up for measuring the position and current of proton beams in the transfer lines between the linac 2 and the psb
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/702814
work_keys_str_mv AT gasiorm aproposalforaninductivepickupformeasuringthepositionandcurrentofprotonbeamsinthetransferlinesbetweenthelinac2andthepsb
AT gasiorm proposalforaninductivepickupformeasuringthepositionandcurrentofprotonbeamsinthetransferlinesbetweenthelinac2andthepsb