Cargando…

Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised

Pb53+ ion beams are accelerated up to a kinetic energy of 4.22 GeV/u in the PS, extracted and stripped to Pb82+ in the TT2-TT10 transfer line from PS to SPS where they are injected and accelerated up to 156.8 GeV/u. The emittance growth in aluminium strippers of different thicknesses has been measur...

Descripción completa

Detalles Bibliográficos
Autores principales: Arduini, Gianluigi, Burkhardt, H, Hanke, K, Martini, M
Lenguaje:eng
Publicado: 2003
Materias:
Acceso en línea:http://cds.cern.ch/record/705619
_version_ 1780902444076630016
author Arduini, Gianluigi
Burkhardt, H
Hanke, K
Martini, M
author_facet Arduini, Gianluigi
Burkhardt, H
Hanke, K
Martini, M
author_sort Arduini, Gianluigi
collection CERN
description Pb53+ ion beams are accelerated up to a kinetic energy of 4.22 GeV/u in the PS, extracted and stripped to Pb82+ in the TT2-TT10 transfer line from PS to SPS where they are injected and accelerated up to 156.8 GeV/u. The emittance growth in aluminium strippers of different thicknesses has been measured in 1995. Recently it has been observed that the model used to interpret the data overestimated the growth by a factor two. Furthermore in 1998 a campaign of measurements of the optics of the injection line has been performed. Here we revise the comparison of the model to the experimental data.
id cern-705619
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2003
record_format invenio
spelling cern-7056192023-02-17T10:08:12Zhttp://cds.cern.ch/record/705619engArduini, GianluigiBurkhardt, HHanke, KMartini, MLead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: RevisedAccelerators and Storage RingsPb53+ ion beams are accelerated up to a kinetic energy of 4.22 GeV/u in the PS, extracted and stripped to Pb82+ in the TT2-TT10 transfer line from PS to SPS where they are injected and accelerated up to 156.8 GeV/u. The emittance growth in aluminium strippers of different thicknesses has been measured in 1995. Recently it has been observed that the model used to interpret the data overestimated the growth by a factor two. Furthermore in 1998 a campaign of measurements of the optics of the injection line has been performed. Here we revise the comparison of the model to the experimental data.AB-Note-2003-095-ABPoai:cds.cern.ch:7056192003
spellingShingle Accelerators and Storage Rings
Arduini, Gianluigi
Burkhardt, H
Hanke, K
Martini, M
Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title_full Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title_fullStr Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title_full_unstemmed Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title_short Lead Ion Transverse Emittance Blow-up at the TT2-TT10 Stripper: Revised
title_sort lead ion transverse emittance blow-up at the tt2-tt10 stripper: revised
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/705619
work_keys_str_mv AT arduinigianluigi leadiontransverseemittanceblowupatthett2tt10stripperrevised
AT burkhardth leadiontransverseemittanceblowupatthett2tt10stripperrevised
AT hankek leadiontransverseemittanceblowupatthett2tt10stripperrevised
AT martinim leadiontransverseemittanceblowupatthett2tt10stripperrevised