Cargando…
SPS New Timing Tests
The SPS master timing generator is foreseen to be replaced in 2004 by a central timing generator called CBCM, which will control the whole accelerator complex. At this occasion a working group has been created to review the actual SPS timing events and how it could fit in with the new MTG. It has be...
Autores principales: | Jacquet, D, Paris, V, Jensen, L, Wehrle, U, Verhagen, H, Partinod, P, Semanaz, P, Jonker, M, Lewis, J, Bau, J C, Bouche, J M |
---|---|
Lenguaje: | eng |
Publicado: |
2004
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/707986 |
Ejemplares similares
-
Measurement of the transfer function of the main SPS Quadrupoles
por: Dinius, A, et al.
Publicado: (1998) -
The Evolution of the CERN SPS Timing System for the LHC Era
por: Alvarez-Sanchez, P, et al.
Publicado: (2003) -
Evolution of the SPS Power Converter Controls towards the LHC Era
por: Brazier, J.C.L., et al.
Publicado: (2001) -
A VMEbus approach for the control of the closed orbit correction power supplies within the SPS supercycle
por: Martinod, P, et al.
Publicado: (1986) -
SPS Beams for LHC: RF Beam Control to Minimize Rephasing in the SPS
por: Baudrenghien, P, et al.
Publicado: (1998)