Ładuje się…
Situation of CB+1/CB+2 mid January 2004
After repair of the big lathe, CB+2 has been prepared to fix the seamless flanges and CB+1 is being machined.
1. autor: | |
---|---|
Wydane: |
2004
|
Hasła przedmiotowe: | |
Dostęp online: | http://cds.cern.ch/record/710608 |