Cargando…

Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes

A workshop was held 16th March 2004 in order to set a clear picture of the status of the geometry of the dipoles of LHC and to assess the need, or not, of a change of the hardware baseline method used to position and lock the cold masses in their cryostat vessel. This document summarizes the content...

Descripción completa

Detalles Bibliográficos
Autores principales: Bajko, M, Jeanneret, J B, Missiaen, D, Parma, V, Poncet, A, Scandale, Walter, Seyvet, F, Tommasini, D
Lenguaje:eng
Publicado: 2004
Materias:
Acceso en línea:http://cds.cern.ch/record/727257
_version_ 1780903785830285312
author Bajko, M
Jeanneret, J B
Missiaen, D
Parma, V
Poncet, A
Scandale, Walter
Seyvet, F
Tommasini, D
author_facet Bajko, M
Jeanneret, J B
Missiaen, D
Parma, V
Poncet, A
Scandale, Walter
Seyvet, F
Tommasini, D
author_sort Bajko, M
collection CERN
description A workshop was held 16th March 2004 in order to set a clear picture of the status of the geometry of the dipoles of LHC and to assess the need, or not, of a change of the hardware baseline method used to position and lock the cold masses in their cryostat vessel. This document summarizes the content of the presentations and spells the recommendations made at the workshop. An implementation of changes to the hardware baseline are outlined.
id cern-727257
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2004
record_format invenio
spelling cern-7272572023-05-31T13:24:51Zhttp://cds.cern.ch/record/727257engBajko, MJeanneret, J BMissiaen, DParma, VPoncet, AScandale, WalterSeyvet, FTommasini, DExecutive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changesAccelerators and Storage RingsA workshop was held 16th March 2004 in order to set a clear picture of the status of the geometry of the dipoles of LHC and to assess the need, or not, of a change of the hardware baseline method used to position and lock the cold masses in their cryostat vessel. This document summarizes the content of the presentations and spells the recommendations made at the workshop. An implementation of changes to the hardware baseline are outlined.LHC-Project-Note-340CERN-LHC-Project-Note-340oai:cds.cern.ch:7272572004-03-31
spellingShingle Accelerators and Storage Rings
Bajko, M
Jeanneret, J B
Missiaen, D
Parma, V
Poncet, A
Scandale, Walter
Seyvet, F
Tommasini, D
Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title_full Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title_fullStr Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title_full_unstemmed Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title_short Executive summary of the workshop on LHC dipole geometry and stability and preparation for the implementation of changes
title_sort executive summary of the workshop on lhc dipole geometry and stability and preparation for the implementation of changes
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/727257
work_keys_str_mv AT bajkom executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT jeanneretjb executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT missiaend executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT parmav executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT ponceta executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT scandalewalter executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT seyvetf executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges
AT tommasinid executivesummaryoftheworkshoponlhcdipolegeometryandstabilityandpreparationfortheimplementationofchanges