ALARA Analysis for Shippingport Pressurized Water Reactor Core 2 Fuel Storage in the Canister Storage Building (CSB)
The addition of Shippingport Pressurized Water Reactor (PWR) Core 2 Blanket Fuel Assembly storage in the Canister Storage Building (CSB) will increase the total cumulative CSB personnel exposure from receipt and handling activities. The loaded Shippingport Spent Fuel Canisters (SSFCs) used for the S...
Autor principal: | Lewis, M E |
---|---|
Lenguaje: | eng |
Publicado: |
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/747975 |
Ejemplares similares
-
The Shippingport pressurized water reactor
por: Atomic Energy Commission. Washington
Publicado: (1958) -
ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities
por: Dayley, L
Publicado: (2000) -
Occupational ALARA Planning for Reactor Pressure Vessel Dismantling at Kori Unit 1
por: Kim, Juyoul, et al.
Publicado: (2020) -
Accident analysis for nuclear power plants with pressurized water reactors
por: International Atomic Energy Agency. Vienna
Publicado: (2003) -
Influence of DT fuel composition on the energy output and its implications on reactor safety and environmental acceptability
por: Tahir, N A, et al.