Cargando…
ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities
The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger...
Autor principal: | Dayley, L |
---|---|
Lenguaje: | eng |
Publicado: |
Fluor Hanford
2000
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/748035 |
Ejemplares similares
-
Anticipated Radiological Dose to Worker for Plutonium Stabilization and Handling at PFP - Project W-460
por: Weiss, E V
Publicado: (2000) -
Technical Basis Document for PFP Area Monitoring Dosimetry Program
por: Cooper, J R
Publicado: (2000) -
The metabolism of plutonium and related elements
por: Commission Internationale de Protection contre les Radiations
Publicado: (1986) -
Safe handling of plutonium: a panel report
por: International Atomic Energy Agency. Vienna
Publicado: (1974) -
ALARA Analysis for Shippingport Pressurized Water Reactor Core 2 Fuel Storage in the Canister Storage Building (CSB)
por: Lewis, M E
Publicado: (2000)