Cargando…

Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup

This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

Detalles Bibliográficos
Autor principal: Koch, M R
Lenguaje:eng
Publicado: RAL 1999
Materias:
Acceso en línea:http://cds.cern.ch/record/748235
_version_ 1780904234206625792
author Koch, M R
author_facet Koch, M R
author_sort Koch, M R
collection CERN
description This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.
id cern-748235
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 1999
publisher RAL
record_format invenio
spelling cern-7482352019-09-30T06:29:59Zhttp://cds.cern.ch/record/748235engKoch, M RAcceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L supDetectors and Experimental TechniquesThis Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.RALEDT-624841RPP-5055oai:cds.cern.ch:7482351999
spellingShingle Detectors and Experimental Techniques
Koch, M R
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title_full Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title_fullStr Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title_full_unstemmed Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title_short Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
title_sort acceptance test procedure for new pumping and instrumentation control skid sup l sup
topic Detectors and Experimental Techniques
url http://cds.cern.ch/record/748235
work_keys_str_mv AT kochmr acceptancetestprocedurefornewpumpingandinstrumentationcontrolskidsuplsup