Cargando…
Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup
This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
RAL
1999
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/748235 |
_version_ | 1780904234206625792 |
---|---|
author | Koch, M R |
author_facet | Koch, M R |
author_sort | Koch, M R |
collection | CERN |
description | This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop. |
id | cern-748235 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 1999 |
publisher | RAL |
record_format | invenio |
spelling | cern-7482352019-09-30T06:29:59Zhttp://cds.cern.ch/record/748235engKoch, M RAcceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L supDetectors and Experimental TechniquesThis Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.RALEDT-624841RPP-5055oai:cds.cern.ch:7482351999 |
spellingShingle | Detectors and Experimental Techniques Koch, M R Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title | Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title_full | Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title_fullStr | Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title_full_unstemmed | Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title_short | Acceptance Test Procedure for New Pumping and Instrumentation Control Skid sup L sup |
title_sort | acceptance test procedure for new pumping and instrumentation control skid sup l sup |
topic | Detectors and Experimental Techniques |
url | http://cds.cern.ch/record/748235 |
work_keys_str_mv | AT kochmr acceptancetestprocedurefornewpumpingandinstrumentationcontrolskidsuplsup |